Run to Waste – Wellington Water
COMPLETION DATE
2017-2018
SERVICES
HDPE Pipeline project – supply of fittings and fabricated items
SECTOR
Civil & Infrastructure
Run to Waste Project – Lower Hutt – Wellington Water
450mm diameter PE 100 SDR17 Run to Waste pipeline was an emergency job to supply water to the Wellington region. This project was completed in a super tight time-frame, and involved key subcontractors from across the region. UPG were involved with the supply of PE fittings and fabricated sections to this project.
Project Partners
Asset Owner: Wellington Water
Client: Hynds Pipe Systems
Systems Employed