Civil & Infrastructure



355mm SDR17 pipework installed at Waste Water Treament Plant for pumped sewer lines. Pre-fabricated sections with long legs on bends to minimize the number of EF couplings required on site and risk
WWTP plant upgrade pipework. Mains pipe is 710mmOD PE100 with 355mmOD connecting lines. Pre-fabricated in sections by UPG to save time and risk on site and limit the amount of Electrofusion couplers that would otherwise have been needed
WWTP plant upgrade pipework. Mains pipe is 710mmOD PE100 with offtake ready for air valve connection. Pre-fabricated in sections by UPG to save time and risk on site and limit the amount of Electrofusion couplers that would otherwise have been needed.