Industrial

MAXAIR and STREAM PE100 pipework installed beside each other for compressed air and process water. Tidy straight pipe runs turning around a structual beam

Wastewater Treatment Plant project – pre-fabricated sections to save installation time and risk on site

MAXAIR and STREAM PE100 pipework installed beside each other for compressed air and process water. Tidy straight pipe runs with offtake saddles off both lines

HAVE A QUESTION? PHONE 0800 473 100 OR CONTACT US BELOW.